Helping Shell

Optimum Resource Utilization

People and material logistics form a critical part of operations at oil and gas companies. Having set one of the highest standards in the oil & gas industry, in terms of HSSE (Health, Safety, Security and Environment) and operations, Shell needed a solution that had the ability to manage people safely and was in full compliance with the standards. The solution had to be robust, manageable, scalable, efficient, off-the-shelf, and have a track record of success. IBS' iLogistics platform was able to provide an integrated people and material logistics management solution across 16 countries, helping Shell become 100% compliant to regulations, significantly reduce costs and transform the travel workflow across various departments.

Download Case Study

Cost saving with iLogistics

Cost saving with iLogistics

The operator used multiple systems to manage their logistics operations, ranging from spreadsheets to sophisticated transportation management systems. The large scale of operations combined with the manual HSSE training/travel document validations, lack of automation in real time tracking of personnel, led to increased errors and redundant processes.

Download Case Study

HSE Process improvements in Gulf of Mexico (GoM)

HSE Process improvements in Gulf of Mexico (GoM)

The client has employees working in various locations like on offshore assets and in high-rise offices. Due to hostile work environment (especially on offshore assets), safety is given top priority. But the client lacked specific processes or tools to track safety compliances and reduce risks. Apart from this tracking of resources and personnel on the board (PoB) or in transit was another major concern area.

Download Case Study

Operational excellence through iLogistics

Operational excellence through iLogistics

The company's excessive reliance on legacy tools (MS Excel/e-mails) and mechanisms that were employed to manage its day-today logistics operations started taking a heavy toll on its operational efficiencies. The approval process was primarily manual and mainly handled through e-mail which in turn led to lack of traceability. All these tools required constant manual intervention, and consequently freight tracking ended up becoming a major area of concern for the company.

Download Case Study

Optimum Resource Utilization

Optimum Resource Utilization

One of the primary challenges that weighed down our client in terms of reduced operational efficiencies was its excessive reliance on disparate, outmoded and manual systems to accomplish day-to-day logistics management tasks. Lack of visibility to logistics requirements led to lack of planning, resulting in underutilization of aviation resources, occasioning more than the required number of trips. Inadequate visibility to platform assets further lowered operational efficiency generating increased operational cost. In order to optimize flight utilization the client commenced flight seat sharing with two other companies operating in the same region.

Download Case Study